Boats docked on the Annapolis waterfrontAnnapolis waterfront

Local guide · Anne Arundel County · October 2026

Building permits in the City of Annapolis

If your address is inside Annapolis city limits, your permit comes from the City's Department of Planning and Zoning, not Anne Arundel County. The rules are similar but not the same. Here are the differences that matter.

Get matched with a builder who knows this

Short answer

Who issues building permits in the City of Annapolis?

The City's Department of Planning and Zoning, for addresses inside city limits. Homes with an Annapolis mailing address outside city limits get permits from Anne Arundel County.

Updated October 2026 · Official sources

CityIssues permits inside Annapolis city limits
2021IRC and IBC adopted by the City
HistoricEvery exterior change in the district needs approval
6 monthsHistoric approval lapses if work hasn't started
City of AnnapolisAnne Arundel County
Who issues permitsCity Dept. of Planning and ZoningCounty Inspections and Permits
ApplyingCity's online permit portalLand Use Navigator
Building code2021 IRC / IBC2021 IRC / IBC
Non-structural window, door or siding replacementNo building permit (§17.05.020)Not addressed on the county's list
Historic review of exterior changesHistoric District: Certificate of ApprovalOnly for inventoried properties
R2 house setbacks (front / rear / side)25 / 30 / 6 ft25 / 20 / 7 ft

1. City or county?

For project rules inside the city, see our guides to decks, fences and sheds. Many homes with an "Annapolis" mailing address are outside city limits and get county permits; Arnold, Riva, Edgewater and Cape St. Claire are all county. Check whether your property is inside the city before you apply, because the City's Department of Planning and Zoning handles permits, inspections, zoning, Critical Area review and historic preservation inside city limits. For county addresses, see how to get a county permit.

2. What needs a city permit

Under City Code §17.05.010, a permit is required to build, enlarge, alter, repair, move or demolish a structure, to change its use, and for electrical, gas, mechanical and plumbing work. The main residential exemption (§17.05.020) is non-structural replacement or repair of windows, doors or siding. The City has adopted the 2021 International Residential and Building Codes. Fees are based on the fair market value of the work, including labor and materials, at rates set by City Council resolution.

3. The Historic District

In the Historic District, every exterior change needs a Certificate of Approval from the Historic Preservation Commission (§21.56.040), even if the work is exempt from a building permit: windows, siding, roofing, fences, sheds and decks included. Staff can approve qualifying work administratively; larger changes go to a Commission hearing, and applications are due weeks ahead. A certificate expires if work hasn't started within 6 months. See our historic district guide.

4. Zoning and setbacks

City zoning is in Title 21 of the City Code. In R2, a single-family house needs a 25-foot front yard (or the established front yard on the block), 6-foot side yards that together equal at least 20% of the lot width, and a 30-foot rear yard, with a height limit of 2.5 stories and 35 feet. In R3, side yards are 5 feet. Confirm the zoning and any overlay for your lot.

5. Water and flooding

Much of the city is waterfront. The City runs its own Critical Area overlay (Chapter 21.54), with a shoreline buffer of at least 100 feet, and no permit is issued until the Planning and Zoning Director finds the project complies. The Director is also the floodplain administrator, and the City's floodplain rules (Chapter 17.11) apply to work in flood zones. See our flood-zone guide and Critical Area guide.

Where this comes up most

Projects we match

Common questions

Who issues building permits in the City of Annapolis?

The City's Department of Planning and Zoning, for addresses inside city limits. Homes with an Annapolis mailing address outside city limits get permits from Anne Arundel County.

Do I need a permit to replace windows or siding in Annapolis?

Not a building permit, if the replacement is non-structural (City Code §17.05.020). In the Historic District, you still need a Certificate of Approval from the Historic Preservation Commission.

What are the setbacks in Annapolis R2 zoning?

For a single-family house: a 25-foot front yard or the established front yard, 6-foot side yards totaling at least 20% of lot width, and a 30-foot rear yard, with a 35-foot height limit.

How long is a Historic District approval good for?

A Certificate of Approval expires if work has not started within 6 months.

Official sources

Annapolis City Code (Municode) · City of Annapolis: Building permits

This guide is general information, not legal or engineering advice. Rules and maps change; confirm the requirements for your property with the permit office before you design or sign a contract.

Related guides

All local guides →

Get matched, free